Construction Process
A quality product depends upon a buildable design, proper scheduling, and skilled craftsmen whom take pride in their work.

Ski-side Camp

This 5,400 s.f. residence with seven levels required 18 months to build.


Ski-side Camp

Craftsman Details

This 3,300 s.f. house required about 7 months to build -- half of the time was spent installing the extensive maple trim.


Project 2

Converting a Cabin

This 700 s.f. cabin grew to more than 1,700 s.f. over a winter.